Basis: Radiation Protection Department Approval No. 15/2026 (issued 05-10-2026, valid to 05-10-2027).
Why it matters
After installation, and periodically after that, a medical facility has to show that dose rates around its rooms are where the design said they would be. That takes measurement on site, not just a calculation.
What you receive
- On-site dose-rate measurements around each room
- A report comparing the results with the design and the area classification
- A clear list of any points that need correcting
How we work
- We agree the rooms, operating conditions and measurement points
- We measure on site with calibrated instruments
- We issue the report and go through it with your RPO
Duration
Set in the quotation after we review your facility file.
Basis
Radiation Protection Department Approval No. 15/2026 (issued 05-10-2026, valid to 05-10-2027).
