Basis: Radiation Protection Department Approval No. 15/2026 (issued 05-10-2026, valid to 05-10-2027).
Why it matters
A room that holds a radioactive source or an X-ray unit has to be planned around it: wall positions, doors, controlled and supervised areas, storage and access. A mistake found after construction is expensive to fix and holds up the licence.
What you receive
- A written review of the drawings against the source or equipment to be installed
- Comments on layout, access control and area classification
- A list of the points to settle before the licence application
How we work
- We receive the drawings, the source or equipment data and the planned use
- We check the layout, the occupancy of neighbouring areas and the access routes
- We issue the written review and go through the comments with your team
Duration
Set in the quotation after we review your facility file.
Basis
Radiation Protection Department Approval No. 15/2026 (issued 05-10-2026, valid to 05-10-2027).
