Controlling the NORM Waste Collection Site in Qatar

Blog / Blog Details
NORM & Oil & Gas

Controlling the NORM Waste Collection Site in Qatar

October 15, 2026

9 min read

DITEC Experts, Radiation Protection Team, ALDuha Institute for Training and Environmental Consulting

Controlling the NORM Waste Collection Site in Qatar

Three controls, before collection starts

Three things have to be in place on a Qatari site before NORM waste is collected: a barrier around the work area carrying radiation warning signs, a ban on anyone untrained working inside it, and a water-resistant plastic cover on the floor where the contaminated equipment is set down. They are clauses 1, 3 and 4 of article 7 of the rules attached to Decision 45 of 2013.

Two words first, for a reader meeting them here. NORM is naturally occurring radioactive material: material in which the concentration of radionuclides has risen because of human activity. Collection, in article 7, is the work of taking that material out of oil and gas equipment when it is in the form of sludge, hard scale, or spent contaminated equipment.

The three controls are about the place, not about the worker. The worker has his own clauses in the same article, and they are a separate subject. Here we stay with the ground, the barrier and the entrance.

Where this sits in the decision

Article 4 makes the generation of radioactive waste subject to following the procedures in these rules, collection among them, and to a licence. Article 7 is where the collection procedure itself is written. So the three controls are not advice. They are the content of a duty that another article made a condition.

The three clauses, clause by clause

Each clause is given here in plain words, in the order of the article.

Clause 1: a barrier, and the signs fixed on it

The work area is defined by putting a barrier around it, and the radiation warning signs are fixed on that barrier. The clause gives a reason for both: so that the work is completed safely.

The wording is one sentence, and the fixing of the signs on the barrier is part of it rather than a separate step.

Clause 3: trained workers only

The clause is a prohibition and not a recommendation. Anyone who is not among the trained workers is not to work in that area.

Note what the clause attaches the ban to: working in the area. It is written about the work and not about mere presence, and we do not stretch it beyond its words.

Clause 4: the plastic cover under the equipment

The floor on which the contaminated equipment is placed is covered. The cover has two described properties: it resists water leaking through, and it stands up to the work without tearing.

Equipment in these rules is a defined word, and the definition reaches containers, pipes and tanks among other things, so the clause is not limited to one shape of item.

The three controls in rows

Clause | What has to exist | What the text does not fix

Clause 1 | a barrier around the work area, with the radiation warning signs fixed on it | no width, no height, no distance from the work, no material and no size of sign

Clause 3 | a ban on anyone untrained working inside the area | no course is named, no training body, no certificate and no period of validity

Clause 4 | a water-resistant plastic cover, able to stand the work without tearing, on the floor under the contaminated equipment | no thickness, no grade of plastic and no margin beyond the footprint of the equipment

What article 7 does not say

We read the seven clauses of article 7 one by one on the text we transcribed. Not one figure appears in any of them. No width, no distance, no dose, no period and no count. This is a negative statement and we bound it to what we transcribed, which is the whole of article 7.

The article also names no course and no training body for the trained workers it requires. It uses the words trained workers and stops. We record the silence and we ask the Ministry about it. We do not fill it with a programme of our own and call that a requirement.

A figure that exists, in another article

A barrier with a stated width does appear in the decision, but it is the barrier around the temporary store and not the barrier at the collection site. Article 10 clause 2 puts it at not less than two metres and calls that ring the supervision area. Carrying that figure across to a collection site is our error to avoid, not the text speaking.

The collection site beside the temporary store

The two places are described in different detail, and our reading, which we attribute to ourselves, is that both are enclosed for one reason. The decision gives a purpose for the collection barrier and gives none for the store barrier. At the collection site the barrier has no dimension in the text. At the store the barrier has a width, and the store itself is treated as a controlled area while the ring around it is the supervision area.

The floor is the opposite case. Both places are given almost the same description of the cover: plastic, water-resistant, standing the work without tearing. Article 7 clause 4 says it of the floor under the equipment at the collection site. Article 10 clause 3 says it of the floor of the store. So the practical lesson is one specification in two places, and the difference between the two places lies in the barrier and not in the floor.

A question we raise and do not settle

Why the collection barrier carries no width while the store barrier does is not answered in the text. We do not read the silence as permission and we do not read it as a prohibition. It is a question for the Ministry, and we put it in writing rather than answering it in house.

Setting up a collection area, step by step

Four steps, in the order of the article, and then one worked case with the arithmetic shown.

Four steps in order

First, decide the boundary of the work area on paper before anything is moved, and write down why the boundary falls where it does. The text asks for the area to be defined and leaves the dimension to you.

Second, put up the barrier and fix the radiation warning signs on it. Fixing on the barrier is the wording of the clause, so a sign resting on the ground is not what was described.

Third, cover the floor where the contaminated equipment will be set down, with plastic that resists water and does not tear under the work.

Fourth, keep a list at the entrance of who is trained for this work, so that the ban in clause 3 can actually be applied by whoever is standing there.

A worked case, with our arithmetic

Say the contaminated equipment occupies a footprint of six metres by four, which is twenty four square metres. The clause asks for the floor on which the equipment is placed to be covered, and names no margin. If the operator chooses half a metre of margin on every side, the covered rectangle becomes seven by five, which is thirty five square metres, and the extra eleven square metres is the operator's choice and not a requirement of the text.

Write the choice and its reason in the method statement. A reader who later sees thirty five square metres on a drawing and twenty four in a clause should be able to see where the difference came from.

Frequently asked questions

Does the decision fix a distance for the barrier at a collection site?

No. Clause 1 of article 7 asks for the area to be defined by a barrier with the warning signs fixed on it, and gives no dimension. The width of not less than two metres in the decision belongs to the barrier around the temporary store in article 10, and it is not carried across.

Who may work inside the collection area?

The trained workers. The clause is phrased as a ban on allowing anyone other than them to work in that area, and the decision names no particular course.

Is a paper notice enough as a warning sign?

The clause says the signs are fixed on the barrier. Fixing is the word used. The material of the sign and its size are not in the clause, so we report what the clause asks and we do not add a specification to it.

Must the whole yard be covered in plastic?

The clause ties the cover to the floor on which the contaminated equipment is placed. A margin beyond that is a choice an operator may make, and it is written down as a choice.

Who decides that a piece of equipment is contaminated?

Article 6 is the place of that test, and it turns on the dose at the surface of the equipment being more than twice the radiation background in the State. The background value is not published in this decision, and the reading itself is a measurement for a specialist to take and record with its date.

Technical note

Keep the place apart from the person. Clauses 1 and 4 describe ground and barrier. Clause 3 describes who may work. A site with the barrier but no control at the entrance has met two of the three.

A figure from another article is not a gap filler. The decision gives a width for the store barrier and none for the collection barrier, and the honest record says so in both directions.

Where DITEC stands, and what this text is

ALDuha Institute for Training and Environmental Consulting (DITEC) works in training and consulting only. Reading article 7 against a yard, and training the people who will stand at the barrier, is training and consulting work. The Institute does not run a laboratory analysis service, does not calibrate instruments and does not test equipment, and field surveys are carried out through specialist partners. Licensed training is what the Institute offers, and nothing in a training programme or in this explanation is an undertaking that a licence will be issued or that it will be issued within any period.

A note on the authority: the text names the Ministry of Environment. Today that competence sits with the Ministry of Environment and Climate Change, Radiation Protection Department. The question about the collection barrier is put to that department. The successor reading is ours and not the wording of the decision, and the original wording is kept inside the quotations in the Arabic text of this article.

This article is an introductory explanation of a published regulatory text and is not a legal opinion.

Related Blog

Explore more articles in NORM & Oil & Gas

NORM Container Labels and the Gamma Spectrometry Sample
NORM & Oil & Gas
October 15, 2026
NORM Container Labels and the Gamma Spectrometry Sample

Article 8 of Decision 45 of 2013 lists what a NORM container label must state, and sends a sample from every container to gamma spectrometry before it is routed.

Read more
Protecting the Worker During NORM Waste Collection
NORM & Oil & Gas
October 15, 2026
Protecting the Worker During NORM Waste Collection

Article 7 of Decision 45 of 2013 asks for bags at the exit, wetting dry material, sealing equipment openings, and a closing sequence after NORM collection work.

Read more
Container Requirements and the 4 Bq/cm² Limit for NORM Waste
NORM & Oil & Gas
October 15, 2026
Container Requirements and the 4 Bq/cm² Limit for NORM Waste

Article 8 of Decision 45 of 2013 sets the condition and material of a NORM waste container. A beta and gamma reading above 4 Bq/cm² on its surface means washing.

Read more